Day 32 opened with a restart on the how-ai-works / ai-stack series.
A tar drop revealed the series was further along than the Day 31 diary and Day 32 2DO
reflected — Parts 2–7 had already been written and validated (vnu clean,
check_tree.sh -a clean) since the Day 31 diary was written. Session pivoted
from "build Part 2" to "catch documentation up to reality," then moved into landing
page integration and a tree-wide audit.
check_tree.sh -a clean (0 orphans, 0 broken links) against the live treehow-ai-works-index.html (identical to ai-stack-index.html, unreferenced)resources/external-ai-tools.html, grouped into General-Purpose and Linux-Focused assistantsai-stack/index.html) and External AI Tools (links to resources/external-ai-tools.html)AI-NEW.html and resources/external-ai-tools.htmlcheck_tree.sh -a across the full 128-file treehref in collaboration/project-diary.html (line 644) — missing closing quote was corrupting the attribute parse and causing a false "missing target" reportbiomes/ side-project images (intentionally unlinked) — not a tooling bug, just an unfiltered run~) files found — already cleanproject-diary.html previously linked to a 2DO-LIST-DAY31.html that never existed; confirm whether that link should point to 2DO-LIST-DAY32.html or whether a Day 31 2DO should be reconstructedcollaboration/lessons-learned.html — Days 11–32 unrecordedDay 32 complete • July 05, 2026 • Craig & Claude collaboration