Day 37 fell on Wednesday July 15, 2026 — five days after Day 36 on July 10. The session opened in a new chat due to context window resource limits on the previous session. Restart files confirmed the project state cleanly.
The primary Day 37 goal from the 2DO list was the glossary build-out.
Confirmed complete — all 19 terms live across all six sections. The
site-wide Quick Links bar (the second Hot item) was also confirmed already
live on AI-NEW.html from a prior session. Both Hot items
from the Day 37 2DO were done before the session formally opened.
Session was used to confirm and document that state, verify the glossary file, and close Day 37 cleanly with diary and 2DO for Day 38.
All 19 terms live. Final build from the catalogued term list:
All 7 Part pages (02 through 07) have inline 📖 Glossary links on the
relevant section headings. Deep-link hash anchors open the correct dialog automatically.
vnu clean on all files. RunVNU.sh confirmed clean across both
ai-stack/ and glossary/ directories.
Live on AI-NEW.html footer — confirmed from screenshot:
Episodes | About | Building in Public | Learning | Resources | Technical Deep-Dive | How AI Actually Works | TMA | Glossary
Retires the "site-wide consistent footer" parking lot item carried since Day 30.
check_tree -a — 129 linked, 0 orphans, 0 broken linksfind . -name "*.html~" -print | xargs rmtar czf AI.tar AI/The glossary project was larger than it looked going in — 19 terms, 7 source pages cross-linked, a JS dialog system, deep-link hash anchors, and vnu clean throughout. It is a genuinely useful reference now, not just a prototype with two entries.
The pattern of working across multiple chat sessions with tar restart packages continues to prove its value. Day 37 opened in a new chat with full context recovered in minutes. The diary + 2DO + key files protocol works.
cmh — AI Education Project Day 37 — July 15, 2026
Next session: Day 38 — TMA breadcrumbs + parking lot review